1 8 1 6

No. of days since the
last lost time accident

Project Records

The organisation runs an electronic and hard copy records system in parallel. Different types of information include:  

Pre-prospect

Information regarding possible prospects, such as a Land Registry map or landowners correspondence. If a pre prospect is deemed viable it will progress to a prospect status.

Prospect

More detailed information regarding a particular site. If a prospect is considered worth pursuing it will progress to Key Review A and will be given a unique reference number which will remain with it if it reaches project status.

Project

Once a prospect has passed Key Review A it will be converted into a project. Details of all the existing hard copy project files can be found on the PRS system. All staff have access to the PRS and can check details of projects or request archived files.

Livelink

Livelink (Enterprise Connect) is the organisation’s centralised electronic document management system where all the company’s core records should be saved both corporate and project related.

All new members of staff will receive a Livelink training session from the Information and Records team. If you require refresher training on the system please get in touch with us.

Drawings, Images and Aerial Photos

Drawings created by the Graphics team or provided by consultants are all logged on the Drawing Register.

All digital images taken by staff in the course of their work should be saved onto the Digital Library or in the Images folder of the Project it relates to.

Aerial photographs in CD format are stored in the records room and logged on the PRS system.

Maps

The organisation has a library of Ordnance Survey maps, geological maps and abandonment plans which are used by the Mining team.

Landranger and Explorer maps are stored at each area office. They are all logged and can be booked out for use when required.

Group Files

Group files contain non-project related information such as business initiatives or office administration.

Please contact us if you require new files or volumes setting up.

Consultants Information

Information provided by consultants regarding projects must be added to the central system. Any consultants information in CD format will be logged and the CD will be available to book out.

Project reports on CD will be uploaded to the appropriate project folder in Livelink.

@ 2026 Banks Group. All rights reserved